![]() The tank is flat packed to your site. |
![]() A level sand covered base is prepared. |
![]() The base plates are laid ready for the panels. |
![]() The panel segments are stood up and slid into the base. |
![]() Lunch time!! |
![]() The liner is spread over the base and up the sides. |
![]() That’s it. In two days the 404,000 litre effluent tank is ready to use! |
||
![]() |